METER TRIMMING Springtime brings a lot of plant growth. While this is usually very pretty it makes it difficult to access and read your water meter. The District has the legal right to be able to access our meters for BOTH reading and maintenance. If plant growth is infringing upon your meter, please trim and maintain a two-foot area around the meter.
|
|
Read more...
|
|
District is working with Brightwater to develop backup wellfield. - April, 2006 The district is currently working to develop a backup wellfield which can be used in the event of disruptions caused by the Brightwater tunnel. We are presently negotiating with the City of Lake forest park for possible use of the Horizon View Park for these wells. The proposed wells would co-exist with existing park development. Agreement (PDF)- between District and King County Brightwater Project Dec. 6, 2003 Brightwater in the local news Brightwater Home |
|
INTERMEDIATE ZONE IMPROVEMENTS PHASE III - Completed The proposed main will replace 2460ft of thin walled steel water main in Lake Forest Park on: - 187th ST between 35th Ave. and 37th Ave and East of 37th Ave. (Schedule A)
- 37th Ave. from Lake Forest Park Elementary to 188th St. (Schedule B)
- Ballinger between 35th Ave. and 37th Ave. (Schedule C)
- 36th Place cul-de-sac off Ballinger near 35th Ave. (Schedule D)
- In addition to the new water main there are 2 new fire hydrants and 34 new services which will be installed as part of the project.
- The Engineers Estimate for the construction project is $419,000 .
STANDBY GENERATOR FOR DISTRICT WATER SOURCE AND SUPPLY (80KW) - Completed INTERMEDIATE ZONE IMPROVEMENTS PHASE IV - Construction Nov-Dec 2006 10" Transmission Main in and near the District Wellhead Protection Area RESURFACING 200k GAL HIGH ZONE STANDPIPE Includes installation of mixing manifold to avoid stagnant water |
|
|